South Lobby construction: May 21 update

front view of General site

Atrium (South Lobby, ground floor). The work will include floor coring (drilling) to help prepare for the arrival of brand new furniture. Small tents will also be set up with soft hoarding to temporarily enclose the space in six sections of the lobby. As a result, space may be limited for those accessing the south entrance.

To help minimize the impact during peak hours for patients, families, and staff, construction will take place between 8 p.m. and 6 a.m. daily. While the work may cause some disruption, the south elevators will still be accessible during this time.

As always, we appreciate help offered by staff, physicians and volunteers for those in need of assistance.

Share this article